PIPING SYSTEMS

THE EXPERIENCE TO DELIVER

MedTec have built an exceptional reputation for providing a professional, reliable and competitive service, offering a turnkey solution for our client's engineering requirements.

At MedTec we have the expertise, wide-range of the CAD software and experience to deliver. We have an exceptional track record for providing our clients with top-class engineering solutions in a hassle free and supportive manner. Our expertise ensures we offer high quality services at competitive rates.

 If you'd like to enquire about our piping system experience, give us a call on +44 (0)1983 294974 or email dcarley@medtec.co.uk


One previous project saw MedTec assist a client with a CO2 process for a DIET plant. We were tasked with finishing piping ISO’s, producing 3D models, generating GA's and producing material take off.

The material takeoff included a catalogue of materials, including quantities of piping types and fittings which were necessary to produce a designed structure. We produced back of house data sheets containing a comprehensive list with various listing columns. There were also columns for the quantity of material and the unit price allowing our client to obtain a precise estimation cost.

We were informed that the work we produced played a vital part in the performance acceptance. All of the piping went in to design, was tested and accepted by TUV SUD with very few weld failures, allowing the client to gain full CE approval.

Thanks to the success of the first project, we were asked to complete further work and provide ISO drawings to assist with design installation requirements where we had to extend a cantilever floor.

The extended platform had to fit 2 x DN300 (12”) ANSI B16.5 Class 300 RF flanged strainer vessels, plus all of the modifications to the joining DN100 piping, including manual process and vent isolation ball valves (DN15, DN40 & DN100) and actuated ball valves (DN100).This design was tricky as space was limited. Our design needed to provide sufficient space for access to the duty/standby strainer vessels so that they could be easily cleaned. We also had to break into a 2nd stage compressor suction, downstream of a pressure control valve and insert filter vessels allowing for a manual isolation process inlet DN100 ball valve, line mounted PSV's and DN40 & DN20 isolation and vent ball valves.